  • Optimization of Beneficiation Process in Chadormalu Iron Ore Concentrate Plant

    The project of optimization of beneficiation process in Chadormalu iron ore concentrate plant started up to run with the capacity of 475 tons per hour in Ardakan, Yazd. Being commissioned by Chadormalu Mining and Industrial Co., this project was implemented in 12 months. The equipment utilized in Chadormalu concentrate plant includes vibrating feeder, wet vibrating screen, and wet drum which are applied in iron ore processing lines and hematite tailing recovery line as well. This project used 75 wet low intensity magnetic drum separators (LIMS) and wet medium intensity magnetic drum separators (MIMS).
    Read More

  • Sizing and Expansion of Golgohar Hematite Iron Ore Project

    This project was set up with the capacity of 400 thousand tons in Sirjan in 2004. Sizing of Hematite iron ore project, commissioned by Golgohar Mining and Industrial Co., was completed within seven months. The equipment used in this project includes dry drum separator, vibrating feeder, grizzly feeder, and two double deck vibrating screens.
    Read More

  • Capacity Expansion of Golgohar Concentrate Production Plant

    In order to expand the capacity of concentrate production plant in Golgohar mines of Sirjan, a project with the same title started to run in 2004 which took six months to be executed. This project, commissioned by Golgohar Mining and Industrial Co., implemented with the capacity of 800 thousand tons per year, using the equipment such as wet and dry belt drums in concentrate lines.
    Read More

  • Crushing and Sizing of Golgohar Iron Ore Project

    2005 was the start-up to this project with the capacity of 1 million tons per year in Sirjan. The crushing and sizing project, commissioned by Golgohar Mining and Industrial Co. with the execution period of 9 months, has used the equipment such as vibrating feeder and grizzly feeder made by Fakoor Meghnatis Spadana Co.
    Read More

  • Enrichment of Iron Ore Natural Fine in Jalal Abad Mine

    This project inaugurated with the capacity of 50 tons per hour in Zarand, Kerman province in 2006. Aspirations of Jalal Abad Iron Ore complex toward its iron ore enrichment realized within 4 months of implementation, using the equipment such as screen, feeder, and belt drum all made by Fakoor Meghnatis Spadana Co.
    Read More

  • Polycom Project of Ardakan Pelletizing Plant

    This project, being done through Fakoor Meghnatis Spadana Co., commissioned by Chadormalu Mining and Industrial Co., was implemented in 12 months with the purpose of blain increasing in Ardakan, Yazd province. The mentioned project with the capacity of 475 tons per hour used the equipment such as high-capacity feeder, vibrating feeder, double deck wet vibrating screen, and wet MIMS/LIMS drum separators. This project applied 75 wet drums – made by Fakoor Meghnatis Spadana Co. – in its iron ore processing lines.
    Read More

  • Development Plan for Sirjan Iron Ore Concentrate Project

    The project, commissioned by Sirjan Iranian Steel Co., started to run in Sirjan in 2012. This project, to be completed within 15 months with the capacity of 2 million tons per year using iron ore, has utilized the equipment such as vibrating screen, and wet MIMS/LIMS drums made by Fakoor Meghnatis Spadana Co.
    Read More

  • Development Plan for Zarand Iron Ore Concentrate Project

    This project was inaugurated in 2012 commissioned by Middle East Meyar Sanat Engineering Co. It took 18 months for the project to be completed with the capacity of 2 million tons per year. This project – located in Zarand, Kerman province - has used wet screen, dry screen, feeder, and wet MIMS/LIMS drums all made by Fakoor Meghnatis Spadana Co.
    Read More

  • ‍Choghart Project

    This project started in 2013 with the capacity of 3.25 million tons per year. The project is to be implemented within 12 months. The aforesaid project using wet drum separator is located in Bafq, Yazd province. The significance of this project lies in the fact that it uses MIMS drum - made by Fakoor Meghnatis Spadana Co. - with the field intensity of 3800 gauss which is known to be the first in Iran.
    Read More

  • Other Projects

    • Iron ore milling and enrichment project of Chadormalu, Saba Nour, Cheshmeh Sefid, and Baba Ali
    • High-carbon ferrochrome plant project
    • Ardakan pelletizing plant Polycom project (blain increasing)
    • Golfa project
    • Gohar Zamin project
    • Kani Sanat Caspian Co. project
    • Asfalt Tous Co. project
    • Ehya Sepahan Iron Ore Mines Co. project
    • designing and manufacturing of vibrating equipment for Sirjan four-million-ton project
    • designing and manufacturing of vibrating equipment for Bardsir Steel direct reduction project
    • Sirjan Iron Ore Concentrate project
    • Zarand Iron Ore Concentrate project